Fastest Way to Travel between KLIA Main Terminal Building and klia2

klia2 - 2014-07-15 08.12.21
klia2 – 2014-07-15 08.12.21

The newly opened klia2 terminal not so far from the existing Main Terminal Building (MTB), Kuala Lumpur International Airport (KLIA). Before the new terminal opens, low-cost flights were operated at LCCT, a makeshift terminal modified from a cargo terminal. Facilities placement was improper and the previous LCCT was deemed unfit to cater unexpected growth of passengers. Besides, being a cargo terminal, connectivity with MTB is poor.

The new klia2 has dedicated ERL tracks linking it to MTB and upwards to Kuala Lumpur city centre. Both KLIA Ekspres and KLIA Transit trains stop at klia2 terminal. Therefore, passengers can board either train to travel between MTB and klia2.

RM 2 charge is required for the terminal transfer and it is payable by cash at the ticket counter or via usage of Touch ‘N Go card.